70,000lb Cellular Building Mountain Top Set

Northwest Crane Service and Northwest Logistics Heavy Haul collaborated to transload, transport, and set a 70,000 lb Cellular Structure over space limited mountainous terrain.

Northwest Crane Service rigged up a Liebherr LTM 1100-4.1 at the base of location to transload the structure from the over the road haul truck to Northwest Logistics Heavy Haul’s heavy duty tandem rig up truck. The lift plan was engineered for the crew to position the equipment to avoid overhead power lines and preexisting on site Cellular equipment on the cramped location. The heightened maneuverability of Northwest’s Liebherr LTM 1100-4.1 and the high capacity of Northwest Logistics Heavy Haul’s tandem trucks allowed Northwest Company to deliver a safe and efficient project package to the customer.

70,000lb Cellular Building Mountain Top Set

Industry: Communications

Equipment Type: All-Terrain Mobile Crane

Equipment #: Liebherr LTM 1100-4.1

What Our Clients Are Saying:

CSPI

“I want to thank Chris and Northwest Crane Service for the quick response of the safety pin issue.  I told the team how much I appreciated the safe work ethic and excellent job they did on the project here this week. They made a major job task look easy!  Thanks for all y’all did for the project successes this week sir!”

Terry L Smith 
HSE Advisor CSPI


Looking for an operated and maintained crane for your next project? With just a few details we can start estimating.

Request A Quote